Journal of Public Transportation Article in Volume 17, Issue 2 (2014) by Young-Jae Lee, Shaghayegh Shariat, Keechoo Choi. With skip-stop rail transit operation, transit agencies can reduce their operating costs and fleet size and passengers can experience reduced in-transit travel times without extra track and technological improvement. However, since skip-stop operation does not serve all stations, passengers for certain origins-destinations could experience increased access time, waiting time, total travel time, and/or transfer. Only when the stopping and skipping stations are carefully coordinated can skip-stop service benefit passengers and transit agencies. This research developed a mathematical model using a Genetic Algorithm that coordinated the stopping and skipping stations for skip-stop rail operation. Using the flexibility of a Genetic Algorithm, this model included many realistic conditions, such as different access modes, different stopping scenarios, different collision constraints, and different objective functions. Passengers were put into three types and nine groups depending on their origin-destination pairs and the station and transfer choices. Four types of collision constraints were developed depending on the skipstop strategy. For this research, Seoul Metro system Line No. 4 was used as an example. With skip-stop operation, total travel time became about 17–20 percent shorter than with original all-stop operation, depending on the stopping constraints. In-vehicle travel time became about 20–26 percent shorter due to skipping stations, although waiting, transfer, and additional access times increased by 24–38 percent. View Article
Recent Posts
- 21 Jan 2021Current Practices in the Use of Onboard Technologies to Avoid Transit Bus Incidents and Accidents (TCRP Synthesis of Transit Practice)
- 21 Jan 2021Characteristics and Elements of Non-Punitive Employee Safety Reporting Systems for Public Transportation (TCRP Research Report)
- 21 Jan 2021FTA Annual Report on Public Transportation Innovation Research Projects for Fiscal Year 2020 (Report 0181)
- 21 Jan 2021FTA Standards Development Program: Crashworthiness/Crash Energy Management Follow-up for Less than 30 Ft Bus (Report 0141)
- 21 Jan 2021FTA Standards Development Program: Crashworthiness/Crash Energy Management for Transit Bus (Report 0179)